Pos. 01 Consulting · architectural glass

Independent · technically sound

Clarity for every glass decision.

We guide architects, engineers and planners, building owners and investors through every glass question — from the first design to documented construction. Independent of manufacturers, reliable according to the standards, clearly documented.

In modern construction, glass is both a high-performance material and a risk: fire protection, acoustic insulation, solar gain, barrier safety and energy efficiency all interact. As independent glass consultants, we sort out these requirements, check them against DIN 18008 and the German Building Modernisation Act (GModG, formerly GEG) and turn them into a reliable recommendation — from design to tender.

— Principle

A neutral party between design and construction.

Modern architecture asks a lot of glass: it should insulate and let in daylight, protect against noise and sun, prevent falls and shape the design — often all at once. Choosing the right glazing among hundreds of products, coatings and manufacturers is a design responsibility, not a matter of taste.

We are neither manufacturers nor glass fabricators and installers. As independent glass consultants, we translate the requirements of a project into a concrete, verifiable recommendation — backed by DIN 18008, the GModG and the relevant standards, and aligned with research and practice. This turns a glass decision into planning certainty.

01

Independent

No ties to manufacturers, no commission. Our recommendation follows the project, not the catalogue.

02

Standards-compliant

Every recommendation is checked against DIN 18008, the GModG and building physics — reliable right through to the tender.

03

Documented

Clearly recorded — as a basis for tendering, construction and defect claims.

Pos. 02 Who we advise

Four perspectives — one material.

Detailed pages for each group are available in German.

Pos. 03 Work stages (LP) · HOAI

We guide you through every stage.

Glass is not a decision made at the end — it runs through the entire design process. We support you from the basic evaluation to site supervision, along the work stages of the German fee structure for architects and engineers (HOAI).

  1. LP 1 Basic evaluation
  2. LP 2 Preliminary design
  3. LP 3 Design
  4. LP 4 Approval
  5. LP 5 Detailed design
  6. LP 6 Tender prep.
  7. LP 7 Award
  8. LP 8 Site superv.
  9. LP 9 Aftercare
Pos. 04 Defects · expert reports

When glass goes wrong.

We assess damage independently, establish the causes and document them reliably — as a basis for a notice of defects, remedial work or defect claims. The detailed articles are in German.

Pos. Type of damage Classification Detail (DE)
04.1 Structural design errors Glass thickness · DIN 18008 →
04.2 Window installation Defects & solutions →
04.3 Acoustic glass not working Design errors →
04.4 Condensation on windows Causes & solutions →
04.5 Thermal stress breakage Causes & prevention →
Pos. 05 Notes · frequently asked questions

What planners often ask.

Short, reliable answers to recurring questions about glass consulting, standards and liability. If in doubt, we assess your specific case.

01 What does glass consulting cost?

The cost depends on scope and work stage. An initial technical assessment as part of a briefing is non-binding; for glass selection, checks against DIN 18008 or an expert report we prepare a transparent quotation based on effort. What matters: independent advice early in the project prevents expensive design errors and remedial work during construction.

02 Who is liable for glass breakage or glass damage?

That depends on the cause of the damage. If there is a design or workmanship error — such as a glass thickness that is undersized to DIN 18008 or incorrect support — the designer or the contractor is liable. With thermal stress breakage or material defects, the line is often disputed. We assess the cause as experts and document it reliably as a basis for a notice of defects and defect claims.

03 Which glass do I need for barrier glazing?

Barrier glazing is covered by DIN 18008-4. As a rule, laminated safety glass made of several panes with a PVB interlayer is used, depending on the category (A, B or C) and the installation situation. The exact glass thickness and build-up follow from the design loads, the support and the guarding height — and must be verified by calculation.

04 What does DIN 18008 cover?

DIN 18008 is the central design standard for glass in construction. It covers load-bearing glazing and barrier glazing — from linearly supported and point-fixed panes to overhead glazing and walk-on glass. All safety-relevant glazing must be verified against the applicable parts of the standard.

05 When is fire-resistant glass (EI 30 / EI 90) required?

Fire-resistant glazing is required where the building regulations or the fire safety strategy call for fire resistance — for example in escape routes, stairwells, fire walls or between separate units of use. The classification (E, EW, EI) and the duration (30, 60, 90 minutes) follow from the specific requirement. We match the right glazing to the fire safety strategy.

06 How do toughened, laminated and heat-strengthened glass differ?

Toughened safety glass (ESG) is thermally toughened and breaks into small, blunt fragments. Laminated safety glass (VSG) consists of several panes with a tough interlayer and holds together when broken — it retains fragments and, with a suitable build-up to DIN 18008-4, works as barrier glazing. Heat-strengthened glass (TVG) lies in between and is mostly used as the basis for laminated safety glass. Which glass is permitted depends on the safety requirement and the standard.

Pos. 06 Next step

A briefing is enough — we guide you the rest of the way.